Water Well Journal

September 2019

Water Well Journal

Issue link: https://read.dmtmag.com/i/1156049

Contents of this Issue

Navigation

Page 3 of 75

Featured ARTICLES 21 Greasing the Drill Rig By Mike Price How automatic grease systems and manual grease banks can make this preventive maintenance task safer for your crew. 25 Working with Tier IV Engines By William Wagner They're here to stay, so it's a must knowing how to maintain them. 29 Nine Things You Need to Know About Business Credit By William Lynott Credit can be a valuable tool when used wisely. 47 2019 Heavy Equipment Directory Find out what you need to know about the industry's manufacturers of heavy machinery and their offerings. September 2019 Vol. 73, No. 9 waterwelljournal.com About the cover: Jim McCann and Zenda McCann work on a residential well in Ranchos de Taos, New Mexico. The well was drilled 250 feet and produced 25 gallons per minute. Zenda is president and Jim is vice president of Rocky Mountain Drilling Inc. in Taos, New Mexico. Photo courtesy Jeff Black of Synergy Photographics. 2 n September 2019 WWJ

Articles in this issue

Links on this page

Archives of this issue

view archives of Water Well Journal - September 2019