Water Well Journal

September 2020

Water Well Journal

Issue link: https://read.dmtmag.com/i/1279346

Contents of this Issue

Navigation

Page 3 of 67

Featured ARTICLES 21 A Voice for the Industry By Mike Price Maine State Representative and driller/ owner Chad Grignon is looking out for his fellow contractors. 27 The Moving Drill Bit Store By Mike Price Rich Stewart travels the Midwest to ensure contractors are tooled up with the right drill bit. 31 Finding a Common Ground By Thomas M. Hanna, RPG A uniform system for classifying water well boreholes would advance the groundwater industry. 35 2020 Heavy Equipment Directory Find out what you need to know about the industry's manufacturers of heavy machinery and their offerings. September 2020 Vol. 74, No. 9 waterwelljournal.com About the cover: A clear sight of Lake Minnetonka makes a picturesque backdrop for a 44-ton residential geothermal system being installed in Woodland, Minnesota, by a crew from Bergerson-Caswell Inc. The system had 44 bores installed to 200 feet. Bergerson-Caswell, located in Maple Plain, Minnesota, is a full-service water well contracting company that was established in 1948. Photo courtesy David Henrich, CWD/PI, CVCLD, president of Bergerson-Caswell and the 2018 president of the National Ground Water Association. 2 n September 2020 WWJ

Articles in this issue

Links on this page

Archives of this issue

view archives of Water Well Journal - September 2020