SportsTurf

July 2013

SportsTurf provides current, practical and technical content on issues relevant to sports turf managers, including facilities managers. Most readers are athletic field managers from the professional level through parks and recreation, universities.

Issue link: https://read.dmtmag.com/i/141613

Contents of this Issue

Navigation

Page 24 of 48

crew has been asked to transition from perennial ryegrass to bermudagrass in the spring/early summer while keeping the fields game ready for recruiting visits and summer camps. Southern sports turf managers know and have been told by many experts that in order to maximize the health of bermudagrass, timely removal of the ryegrass in early spring is essential. Dense ryegrass stands can suppress bermudagrass growth and reduce development throughout the summer. Thus applying an herbicide is the most assured way to control the perennial ryegrass and encourage bermudagrass development. The problem with chemical removal is that we normally observe a 3 to 6 week period of low quality turf between perennial ryegrass death and bermudagrass development. Low quality turf is seen as a negative for recruiting. The Auburn grounds crew has reached out to major league baseball groundskeepers to learn how they manage transitioning in the middle of a baseball season without using chemicals. After many conversations, the decision has been made use lower mowing heights, grooming, aerification, and soluble nitrogen to favor bermudagrass growth without a massive die-out of ryegrass. Mowing height is gradually reduced from 7/8" to 5/8". Vertical mowing occurs every other week as a groomer to remove ryegrass leaves and allow sunlight to reach the bermudagrass. Core aerification further thins the ryegrass canopy and increases sunlight into the soil surface. Light, frequent applications of soluble N supplement a slow release polymer coated urea application to www.stma.org favor bermudagrass growth. The needs of recruiting make the effort to minimize the time frame of visible grow-in necessary. If unsuccessful, the final option would be to re-sod the football fields each spring for an instant transition. THE SHADE LINE created by construction of indoor practice facility on outdoor practice fields. MANAGING SHADE ISSUES Recently, the Auburn grounds crew inherited a new challenge in turf management. Completion of an indoor football facility created instant shade issues on the outdoor fields. Building the indoor field on the south end of the football complex allows the athletes to walk straight from the weight room to the field without going outdoors. While convenient for the football team, the indoor facility is SportsTurf 25

Articles in this issue

Links on this page

Archives of this issue

view archives of SportsTurf - July 2013