Better Roads

January 2014

Better Roads Digital Magazine

Issue link: https://read.dmtmag.com/i/239057

Contents of this Issue

Navigation

Page 21 of 31

InCourt by Brian Morrow, P.E., Esq. Attorney Brian Morrow is a partner in Newmeyer & Dillion LLP and a licensed civil engineer specializing in construction law, incl. road and heavy construction. brian.morrow@ndlf.com Ambiguous Contract Court denies government's motion to dismiss contractor's $1 million claim I n the recent case of West Bay Builders, Inc. v. Dept. of the Interior (April 29, 2013), the government's motion to dismiss West Bay Builders' claim for almost $1 million was denied based on a contract ambiguity regarding concrete construction joints. The subject of contract interpretation involves interpreting human communications. Construction and contract law are two specialized fields with their own set of jargon and technical language that has developed during time. The language of these areas is common to architects, engineers, contractors, subcontractors, material suppliers and attorneys. This language, however, is foreign and often misunderstood by lay people and the courts: courts often with rules of contract interpretation, especially in technical areas like construction law. Throughout the years, different court approaches have developed to contract interpretation. These include "strict" rules of interpretation that focus on determining a contract's "plain meaning." In contrast, "liberal" rules of interpretation focus on determining the "intention of the parties." Ambiguity in contracts occurs when contract language has more than one meaning. If an ambiguity is obvious, it is called "patent." If there is a hidden ambiguity, it is called "latent." Since construction contracts typically include numerous documents, including the contract, general and supplementary conditions, specifications, and drawings, the likelihood increases of an ambiguity in the contract. In attempting to interpret ambiguities in contracts, courts often sometimes consider the role of trade custom and usage, including the parties' course of performance. In West Bay Builders, Inc. vs. Dept. of the Interior (2013), the contractor claimed an ambiguity in its contract regarding construction joints for a concrete siphon. West Bay 20 January 2014 Better Roads Builders was awarded a contract to construct the Red Bluff Pumping Plant and Fish Screen Landfill Excavation & Canal, Siphon and Access Bridge. The concrete siphon consisted of a large concrete structure with a slab-on-grade, walls and a ceiling. Section 3.04 of the specifications, "Joints and Edges," set forth four joints to be used in concrete construction, including construction joints, contraction joints, control joints and expansion joints. On Feb. 2, 2010, West Bay submitted RFI No. 1, requesting permission to omit the construction joints at the intersection of the walls and top of the siphon because it planned to place the vertical walls and top of the walls monolithically. The government denied the request, stating the construction joints were necessary "at the design locations due to the restrained cracking experienced in similar types of structures, particularly in the thick areas where walls/floors or wall/ceilings are cast together." A year later, West Bay asked the government to reconsider its response. West Bay stated it had based its bid on pouring the siphon walls and soffit monolithically. After its request was denied, West Bay stated it had proceeded with a different form system for Phase I of the siphon, was not as productive as hoped for and incurred substantially more costs than anticipated. To mitigate its losses, West Bay requested the government reconsider RFI No. 1 because they said it would save both parties time and money. In April 2011, the government denied West Bay's request. West Bay wrote the contracting officer (CO), stating "industry standards" indicate the contractor should decide whether or not to include or eliminate construction. On July 14, 2011, West Bay submitted a proposed change seeking $920,163 from the government's refusal to eliminate the construction joints. On Aug. 1, 2011, West Bay converted its proposal to a certified claim. On Oct. 28,

Articles in this issue

Links on this page

Archives of this issue

view archives of Better Roads - January 2014