IDA Universal

November/December 2014

Issue link: https://read.dmtmag.com/i/430655

Contents of this Issue

Navigation

Page 72 of 83

I DA U N I V E R S A L N ove m b e r - D e ce m b e r 2 0 1 4 73 NUTS & BOLTS continued from page 25 13&$*4*0/%*&4&-1"354t."+0364&/(*/&4t(-0#"-%*3&$5%&-*7&3:t'6--5&$)4611035 A diesel engine goes down. Work stops. But not for long. For 60 years, we've manufactured high quality replacement parts for major US engines and heavy-duty applications. Quick order response gets you up and working fast. Call us. 1-800-321-4234. ©2013 Interstate-McBee manually select that change in guidance," says Anetsberger. Another unique benefi t is the facing angle compass. "Again, using that slope example, this compass allows us to square the machine to the slope, basically getting the bucket's cutting edge perpen- dicular to the slope," Anets- berger indicates. "To have the best fi nish grade accuracy, you want that cutting edge lying fl at on that target surface. If you're off a little bit, rotated slightly, one tip would be contacting and the other tip would be high. With this facing angle compass, it allows the operator to place the bucket perpendicular to the slope. at might seem easy, but it is actually quite diffi cult if you didn't have this tool, especially if you consider a machine sitting on an uneven surface." e excavator can also be used in guidance or indicate- only mode, if needed. is is made easier via the enhanced monitor, which displays readouts for elevation and the conventional lightbars. "We also add audio guidance," says Anetsberger. "You can select diff erent tones that play at predetermined or preset distances away from target grade, so you don't need to be staring at this control box or at the lightbar to know how far away you are from grade." Finally, the PC210LCi-10 can be equipped with a cellular modem that enables the machine control system to integrate with Topcon SiteLink 3D Enterprise jobsite manage- ment technology. is enables the job fi le, targeted design surfaces and tasks to be sent to the operator at the start of the shi , and as-built data to be sent to the offi ce from the machine at the end of the shi . Delivering Quick ROI As you might expect, the PC210LCi-10 with machine control comes at a higher cost than the standard model PC210LC. " ere is a premium, as there was between the standard bulldozer and a model with machine control," acknowl- edges Peter Robson, director, Intelligent Machine Controls at Komatsu. "It's a signifi cant premium but it's [one] that the majority of customers do see a return on investment in 12 to 18 months." Return on investment stems in part from the elimination of grade staking and reduction in rework on a project. " ere are no grade stakes out there; there's nobody else out there in the working environmental," Robson comments. en consider the cost to replace bedding material due to over excavation at, say, $50 to $60 per cu. yd. on a 100-yd. trench. "Already you can start to do the math of the savings poten- tial of these machines." Next, add in the time savings associated with using machine control. " e time taken to pull out 100 . of trench or slope is going to relate back into fuel savings – gallons per hour removed – because you're not going to have as much idle time waiting to do grade checking," Robson points out. "You're going to constantly be able to make your performance from point A to point B accurately and in time, and really reduce fuel consumption." is in turn equates to environmental benefi ts. "With less fuel burn, you have less CO2, you have less NOx," says Robson. "So as far as sustain- ability goes and your impact on the environment, you're defi nitely going to make a large reduction in your carbon footprint." ere is defi nitely an overall savings vs. conven- tional methods. "We've compared this machine against conventional opera- tion – stakes, no GPS, no machine guidance whatsoever – and we saw a reduction of 63 percent in construction time, which is a huge number," says Anetsberger. " at's just one example of a hard fi gure that we've seen in our own testing here at Komatsu." More to Come Robson sees PC210LCi-10 machine control excavator as a stepping stone for future intro- ductions. "[ e technology] is scaleable within the excavator range, so I think within the next 12 to 18 months, you will see it in other models," he states. Which size classes will depend largely on customer applications and require- ments? "It's the utilization that a contractor sees and the ROI factor," Robson comments. "But I think the prevention of over excavation is really going to spark a lot of interest in the marketplace and in the customer base." ●

Articles in this issue

Links on this page

Archives of this issue

view archives of IDA Universal - November/December 2014