Overdrive

September 2012

Issue link: https://read.dmtmag.com/i/78449

Contents of this Issue

Navigation

Page 59 of 125

CUSTOM RIGS HOW TO bolts holding the fac- tory Y pipe hanger. Remove the hanger and discard. Use the torch to cut a notch into the lower 6 inch- es of the aft toolbox brace and grind the edges smooth. 3 Use a cutting torch to split the two Huck Perfect workbench Place a couple of blankets over the tires and lay the stack in the V created by the space between the tires to put the system together. steel sleeve inserts. 4 5 sure 55 inches up from the seam where the elbow and stack come together. Use tape to hold the clamp in place until it's lightly tightened. Eyeball proper position between Lincoln Chrome's stack miter angle and elbow placement. Lightly tighten the lower clamp. Final adjustments will be made on the truck. To properly position on the upper stack clamp mount, mea- Bolt the new brackets in place. Use anti-seize on the bolts that go through the vibration isolators to prevent them from galvanizing to the isolator's 58 | Overdrive | September 2012

Articles in this issue

Archives of this issue

view archives of Overdrive - September 2012