ROUNDABOUT Heidi Flateau'
s
Transforming a major four-way intersection into a traffic roundabout is no easy task. How do you install pavement to meet growing traffic needs without removing the existing concrete - all within specified grade limits? Add to it deteriorating pavement conditions and the constant left turns the roundabout would endure, and it became a very unique challenge. As Project Engineer Heidi Flateau evaluated her options, it became clear that utilizing Tensar's TriAx® Geogrid was the smartest decision. This resulted in a projected 20-year service life, a savings of $500,000, and the reduction of future reflective cracking. Heidi's assessment of TriAx Geogrid's performance? "I love that stuff!"
To read the whole story, submit your own, or to put TriAx to work for you, visit triaxstories.com/BR or call 888-827-9737.
Write 150 on Reader Service Card