Water Well Journal

March 2015

Water Well Journal

Issue link: http://read.dmtmag.com/i/465664

Contents of this Issue

Navigation

Page 26 of 73

When working with plumbness– alignment specifications, a well drilling contractor should place emphasis on drilling as straight a borehole as possi- ble—because that's when something can be done about plumbness and alignment. It's too late when the well is complete. Twitter @WaterWellJournl WWJ March 2015 23 Figure 4. A gyroscopic deviation survey tool's view of deviation from plumb of a well in vertical north-south section. DACUM Codes To help meet your professional needs, this article covers skills and competencies found in DACUM charts for drillers and pump installers. DO refers to the drilling chart. The letter and number immediately following is the skill on the chart covered by the article. This article covers: DOB-3, DOD-1, DOD-6, DOE-3, DOE-14, DOL-11 More information on DACUM and the charts are available at www.NGWA.org. WWJ Gary L. Hix, RG, CWD/PI, is a registered professional geologist in Arizona, a Certified Well Driller/Pump Installer by the National Ground Water Association, and a Certified Professional Geologist by the American Institute of Professional Geologists. He has authored many articles on subjects related to well drilling issues for Water Well Journal. He can be reached at gary.hix@cox.net.

Articles in this issue

Links on this page

Archives of this issue

view archives of Water Well Journal - March 2015