Featured ARTICLES
19 A Solid Choice
By Jennifer Strawn
When disposing of drilling spoils
gets tough, solidification could be
your best option.
22
Q&A
By Mike Price
Kevin Christensen,
president of Palmer Bit Co.
27 More for Your Dollar
By Joe Haynes
Three key considerations for selecting
geotechnical drills that maximize
return on investment.
31 2016 Heavy Equipment Directory
Find out everything you need
about the industry's manufacturers
of heavy machinery and their offerings.
43 Communication in Construction
By Lana Straub
Work on injection wells requires
all parties working together.
SEPTEMBER 2016
VOL. 70, NO. 9
waterwelljournal.com
About the cover: A rig from Bee Cave Drilling Inc. is set up
and ready to go at a residential irrigation well job site in
western Austin, Texas. The well was drilled 400 feet into
the Edwards Aquifer. Bee Cave Drilling is located in
Dripping Springs, Texas. Photo submitted by Jim Blair,
president of Bee Cave Drilling.
2 September 2016 WWJ