Equipment World

March 2018

Equipment World Digital Magazine

Issue link: https://read.dmtmag.com/i/953148

Contents of this Issue

Navigation

Page 53 of 67

March 2018 | EquipmentWorld.com 54 $47.6 million, of which nearly $22.7 million is for CRCP, according to Benito Trevino of the New Mexico DOT. States interested in in- corporating CRCP have sought advice from TxDOT officials, who have shared specifica- tions, design standards and programs. Says Lukefahr: "There is a tremendous appli- cation, even in Texas, for jointed pavement, and obviously, certain other states think that jointed pavements are a better solution for them than CRCP. But in fair-weather states, the ability to continue the life of the CRCP is more attractive than continu- ous repair and mainte- road technology | continued 777 Main Street, Suite 3900, Fort Worth, TX, 76102 | (817) 490-6800 HEALTHY BUSINESS CHECKLIST See his story and strengthen your business at HealthyBusinessChecklist.com/newyear TxDOT mobilized equipment and crews to assist the Harris County Toll Road Authority with draining water from the West Sam Houston Tollway's main lanes, south of I-10 West, after Hur- ricane Harvey and more than 40 inches of rain. Source: TxDOT

Articles in this issue

Links on this page

Archives of this issue

view archives of Equipment World - March 2018