Aggregates Manager

January 2015

Aggregates Manager Digital Magazine

Issue link: http://read.dmtmag.com/i/440030

Contents of this Issue

Navigation

Page 6 of 43

AGGREGATES MANAGER January 2015 5 by Therese Dunphy, Editor-in-Chief tdunphy@randallreilly.com CALIFORNIA DREAM I n most aggregates operations, producers look for ways to shave pennies, nickels, and dimes from their cost per ton. After all, in a traditionally low-margin, high- volume market, those pennies can add up to serious bucks on an annual basis. Now, imagine learning that your costs are going to increase by nearly a buck a ton and there is little you can do about it. That's what is happening in Banning, Calif., where the local city council put a ballot initiative, Measure J, before voters to assess an 80-cent-per-ton tax on every ton of aggregates produced in the community. Banning officials also allocated $50,000 in taxpayer funds to produce "educational" fliers about Measure J. The city's sales pitch was simple and focused on two emotional hot-buttons: 1) It alleged that the operator was "working the system" and avoiding payment of the community's rightful taxes by moving its point of sales to another municipality where it received a tax incentive. 2) It suggested that by passing the tax on raw mineral products, voters could avoid increases to their own tax burden. Not surprisingly, voters approved the measure, which affects only one operator: Robertson's Ready Mix. The producer will now pay taxes twice; once when the material is produced and again when it is sold. While some communities do assess taxes on aggregates production, the vast majority are used to offset impacts the community bears in association with a mine. For example, some taxes fund environmental studies, pay for road construction around the mine, or provide guarantees toward reclamation efforts. In this case, however, the tax will go to the general fund to pay for such services as police, fire, and general street repair. And no wonder. Banning has a much higher overhead than the neighboring San Jacinto. While San Jacinto has a 50-percent higher population, it has less than half the number of city employees on its payroll. Banning has been operating beyond its means and is looking to a private company to make up the difference. Robertson's has fought back. It took the city to court over spending public funds to promote the issue, and a Superior Court judge told the city to stop. That decision came days before the vote, and the damage was done. Robertson's must now choose from several unpalatable options. It could shut or slow down production at the site. It could accept a higher cost structure in what it has described as an "inelastic market" where the cost could not be added to the final product. Or, it could pursue the matter in court once again. None of those options are good for an aggregates producer, and community schemes such as Measure J should disturb aggregates producers throughout the United States. After all, California dreams, and nightmares, have a way of working their way east. January 2015 Vol. 20, No. 1 aggman.com /AggregatesManager @AggMan_editor Editorial Editor-in-Chief: Therese Dunphy Editorial Director: Marcia Gruver Doyle Online Editor: Wayne Grayson Online Managing Editor: Brian Ethridge editorial@aggman.com Design & Production Art Director: Sandy Turner, Jr. Production Designer: Timothy Smith Advertising Production Manager: Linda Hapner production@aggman.com Construction Media VP of Sales, Construction Media: Joe Donald sales@randallreillyconstruction.com 3200 Rice Mine Rd NE Tuscaloosa, AL 35406 800-633-5953 randallreilly.com Corporate Chairman/CEO: Mike Reilly President: Brent Reilly Chief Process Officer: Shane Elmore Chief Administration Officer: David Wright Senior Vice President, Sales: Scott Miller Senior Vice President, Editorial and Research: Linda Longton Vice President of Events: Stacy McCants Vice President, Audience Development: Prescott Shibles Vice President, Digital Services: Nick Reid Vice President, Marketing: Julie Arsenault For change of address and other subscription inquiries, please contact: aggregatesmanager@halldata.com. Aggregates Manager TM magazine (ISSN 1552-3071) is published monthly by Randall-Reilly Publishing Company copyright 2015. Executive and Administrative offices, 3200 Rice Mine Rd. N.E., Tuscaloosa, AL 35406. Subscription rates: $24 annually, Non-domestic $125 annually. Single copies: $7. We assume no responsibility for the validity of claims of manufacturers in any advertisement or editorial product information or literature offered by them. Publisher reserves the right to refuse non-qualified subscriptions. Periodical circulation postage paid at Tuscaloosa, Alabama and additional entries. All rights reserved. No part of this publication may be reproduced or transmitted in any form or by any means, electronic or mechanical, including photocopying, recording, or by an information storage retrieval system, without written permission of the copyright owner. POSTMASTER: Send all UAA to CFS. (See DMM 507.1.5.2); NON-POSTAL AND MILITARY FACILITIES: send address corrections to Aggregates Manager, 3200 Rice Mine Road N.E., Tuscaloosa, AL 35406. or Nightmare?

Articles in this issue

Links on this page

Archives of this issue

view archives of Aggregates Manager - January 2015