Water Well Journal

March 2015

Water Well Journal

Issue link: http://read.dmtmag.com/i/465664

Contents of this Issue

Navigation

Page 3 of 73

Featured ARTICLES 17 Dealing with Problem Waters By Jennifer Strawn Know how to minimize mistakes and keep your customers loyal. 20 On Target By Gary L. Hix, RG, CWD/PI Straight wells require straight drilling methods. 25 Bentonite for Geosynthetic Liners By Heather Otell and Eric Frantz The use of geosynthetic liners began in Europe in the 1970s. 28 Estimated Groundwater Use in 2010 in the United States By Kevin McCray, CAE Withdrawals of groundwater declined, continuing a trend beginning in 2000. 32 By Michael C. Alfieri, PG, P.Hg., CGWP, and Babs Makinde, PE, D.WRE Section 7 (Testing for Performance) Section 8 (Data Recording) MARCH 2015 VOL. 69, NO. 3 About the cover: A crew from Straub Corp. works on a project in West Texas. Casing was installed and sealed with bentonite cement grout, but during the curing period of the grout the casing failed from excess heat. The drilling crew drilled out the casing and cement and installed new material. Photo submitted by Raymond L. Straub Jr., PG, of Straub Corp. in Stanton, Texas. 2 March 2015 WWJ waterwelljournal.com

Articles in this issue

Links on this page

Archives of this issue

view archives of Water Well Journal - March 2015